What Yellow Pencil can provide
We organize project inputs and produce the drawing set agreed in the written scope.
- Plans, elevations, sections, and details
- Markups and revision coordination
- File format and deadline agreed first
Drawing + BCIN Coordination
We produce agreed drawings and identify which qualified professional must review or take responsibility.
Published package price
CAD $0.50 / sq ft
Drawing production only; regulated services separate
We organize project inputs and produce the drawing set agreed in the written scope.
Permit design responsibility stays with a qualified and registered practitioner when the law requires one.
Share the address, building use, scope, existing records, deadline, and intended permit use.
Continue exploring
Planning the work
Yellow Pencil can produce coordinated plans, elevations, sections, and details from project information and markups. The exact set, source information, reviewer, revision rounds, file format, and deadline are written into the quote before production starts.
If drawings will support an Ontario permit application, a qualified and registered designer, architect, or engineer may need to review and take responsibility for the relevant design. Yellow Pencil does not represent itself on this page as the registered designer of record and does not include a BCIN or professional stamp in the production price.
CAD $0.50 per square foot applies to the agreed drawing-production package. The quote defines which sheets and revisions are included, which source files the project team supplies, and who gives consolidated review comments.
BCIN services, architectural or engineering review, professional stamps, surveys, consultant reports, permit fees, municipal submissions, and construction are separate. They are only included when a written quote explicitly names them and the qualified provider responsible for them.
The first review identifies the property, building use, proposed work, existing drawings, known conditions, and intended use of the new set. It then separates ordinary drawing production from work that may require a registered practitioner or another consultant.
Production can begin after the scope, inputs, reviewer, responsibility boundaries, price, and revision process are confirmed. Permit submission should happen only after the appropriate qualified professional has completed the review and responsibility required for that project.
The published portfolio shows completed residential, retail, office, cabinetry, and millwork work. It demonstrates Yellow Pencil's ability to translate design intent into coordinated details and built interiors.
Those projects do not prove that Yellow Pencil supplied BCIN design responsibility, professional stamps, or permit approval. No project is described that way unless a future record verifies the responsible practitioner and public disclosure is approved.
More options
This page makes no such claim. Registration and the responsible practitioner must be verified for each project.
No. It covers the agreed drawing-production package. Regulated review, stamps, and fees are separate.
No. Permit decisions belong to the authority having jurisdiction, and project requirements vary.
The project must identify the qualified practitioner responsible for the applicable design and review.
Send the address, use, proposed work, existing plans, photos, dimensions, deadline, and permit intent.