YELLOW PENCIL · PLANNING WORKSHEET

Two-tone cabinet finish handoff

Turn a colour idea into a face-by-face brief for review. Finish A / FIN-A and Finish B / FIN-B are the same placeholder labels. Replace them with named, approved physical samples before production.

Illustrative planning tool. This worksheet is not a measured drawing, quotation, order, supply promise or production approval. The three diagrams share one simplified layout; they are not historical customer options. Final dimensions, construction, scope and responsibility need written confirmation.

Blank CSV template

You can type in these fields and print them. There is no submission or storage; entered values disappear on reload. To keep a copy, use Print / save as PDF before closing. Open each illustration for readable face IDs.

1 · Identify the brief

2 · Compare the same layout

A = upper/lower contrast; B = island contrast; C = tall-unit/end-wall contrast. The diagram letters are option names; the finish IDs are separate. For example, option B can contain both FIN-A and FIN-B.

Option A: Upper / lower contrast. Same illustrative kitchen layout, with face IDs.Option B: Island contrast. Same illustrative kitchen layout, with face IDs.Option C: Tall-unit / end-wall contrast. Same illustrative kitchen layout, with face IDs.

Design illustration — not a measured project drawing. Colours are illustrative. Grey elements are counter, backsplash and appliance placeholders. P = perimeter; I = island; V01 = visible niche back only. Unseen faces and additional interiors need their own rows in the final brief.

3 · Name the two actual finishes

Finish A / FIN-A
Finish B / FIN-B

4 · Assign every visible face

The A / B / C column shows the illustration's example finishes, in that order. It is not a project selection. Leave nothing to “match”: choose a finish or identify what remains to be confirmed, by whom, and before which stage.

IDVisible faceExample
A / B / C
Your project finishNotes / responsible person / due stage
P01Tall unit — upper doorB / A / B
P02Tall unit — lower doorB / A / B
P03Tall unit — exposed right sideB / A / B
P04Upper cabinet — left doorA / A / A
P05Upper cabinet — middle doorA / A / A
P06Upper cabinet — right doorA / A / A
P07Hood enclosure — visible frontA / A / A
P08Base cabinet — left doorB / A / A
P09Base cabinet — upper drawer frontB / A / A
P10Base cabinet — middle drawer frontB / A / A
P11Base cabinet — lower drawer frontB / A / A
P12Base cabinet — right doorB / A / A
P13Base cabinet — right fillerB / A / A
P14Base cabinet — exposed right end panelB / A / A
P15Toe kick — left base runB / A / A
P16Toe kick — right base runB / A / A
P17Toe kick — tall unitB / A / B
P18Upper cabinet — right fillerA / A / A
I01Island — left doorB / B / A
I02Island — upper drawer frontB / B / A
I03Island — middle drawer frontB / B / A
I04Island — lower drawer frontB / B / A
I05Island — exposed right end panelB / B / A
I06Island — front toe kickB / B / A
I07Island — right-side toe kickB / B / A
V01Open niche — visible back panelA / A / A
—
—
—
—

All 26 face IDs appear once in each diagram and once in this schedule. Add any other door/drawer fronts, upper ends, hood returns, panel-ready appliance fronts, exposed edges, shelf edges, interior sides and undersides that the final drawing makes visible. The illustration does not specify those unseen faces.

5 · Coordinate adjoining materials

ItemMaterial / exact reference / approved sampleRetained, owner-supplied or included? Who confirms?
Countertop and visible edge
Backsplash / wall finish
Handles / knobs / pulls
Flooring / retained surfaces
Visible appliances / panel fronts

6 · Resolve the handoff in writing

Confirm before releaseRecord / named person / approval
Who verifies field measurements and final drawings?
Who supplies and labels finish samples?
Who approves every visible face and exposed edge?
Who confirms countertop templating and installation sequence?
Who records delivery / installation inclusions?
Who identifies plumbing / electrical and other exclusions?
Who issues and accepts the written quotation / change scope?